"The first day "
The lifting of the capacity of a transformer from (250 to 400) volt
.
We disclosured ofthe distribution transformer in order to raise it from 250 to 400 volts in the Al-Zaatari /Mafraq and identifyied the necessary tools and equipment, needed. alsoWe Ddetermined the number of new and necessary switch gears and ifwhether the distribution transformer needsed a new cable or not,. andWe then lifsent the paper detection and examination to the Supervisor Engineer.
"The second day"
GoiWengt to Sabha station to detect the line Sabha 33 KV (132/33 KV) line in order to determine the cause of the failure. After the disclosure, it showsed that the engineer needed to should reform Timther of circuit breaker, timer and he also removed accumulated dust whlocatend at the head of the cable. During thise day, havwe showinged the rack out of circuit breaker and isolated the line,. We also learned how to complete the Ppaperwork necessary to start work, abeginnindg with cutting off the electricity firstly from the control room admission in Amman, and then isolateing the line and rack from out of the circuit breaker.
"The third day "
There was no Mission (I stayed in the office with the engineer supervising).
The text above was approved for publishing by the original author.
Previous
     
Next
Simplemente dirígete a tu casilla, presiona en el enlace de confirmación que te hemos enviado y recibirás el texto corregido. Si quieres corregir más correos electrónicos, puedes simplemente:
Ó